Next to the already existing 12.1 million sq.ft. Dubai Mall is currently being worked on an expansion of this majestic super mall. Barcol-Air was asked to develop a special class of Air flow Measuring Stations (AFMS), able to withstand the immense pressure of 30 m/s of air flowing through the canals.
LEED certification requires that the air flow is measured and monitored by the BMS. The AFMS, which are installed in the main ducts of the building, measure the air flow of the supply and the extraction ducts creating a combined loop to give maximum energy savings under all load conditions. This “Air Trac®” system developed by Barcol-Air is also applied at Dubai Mall.
Distributor: Dutco Tennant LLC, Dubai, UAE
MEP Contractor: BK Gulf LLC, Dubai, UAE
Consultant: WSP Brinckerhoff, Dubai, UAE